
This assembly meets all code, has ASME and UL backing, and holds the steam and sediments in a closed tank. There is no vent pipe to bust through a wall or floor or ceiling. Multiple blowdowns can be done before the tank needs emptied. Gauges show temperature and pressure so draining can be done under the 140 degree limit. See our products here www.reimersinc.com/docs/custom-engineered-boiler-skid-packages



